Latest Case
glue junction box
Kunming Stone Forest solar photovoltaic: In May, 2015, Kunming Stone Forest solar photovoltaic was combined with experimental demonstration of the late 90 MW power and started to put into production. The total size of power plant construction is 166 MW, with a total investment of RMB 9 billion yuan and its annual generating capacity will reach 188 million kwh, which is equivalent to a Three Gorges power station installed capacity. Part of the power plant adopts 12T05 junction box.
Kunming Stone Forest 166MW photovoltaic plant
In 2014, Golmud 220MW large scale intelligent photovoltaic plant, was a intelligent photovoltaic plant IP65, located in desert sand, with the advantages of natural heat dissipation and maintenance free design; Multi channel MPPT significantly increased power generation, which is far exceed owner's expectations; Station especially uses intelligent wireless transmission system to solve multi device communication. It replaces fiber ring network and do not need communication cable, which solves the problem that the communication cable fault is difficult to locate in the long run. Part of the power plant adopts 12T05 junction box.
Golmud 220MW intelligent photovoltaic plant
Minqin red sand hillock 3000MW photovoltaic plant:On June 2014, The first phase of construction of  Minqin red sand hillock 3000MW photovoltaic plant is 58.5 MW. The entire photovoltaic power plant construction scale is 300 MW with total investment of photovoltaic power project 3 billion yuan. After the completion of the project, the annual generating capacity is 480 million kwh and annual generating income will be more than 430 million yuan. Part of the power plant adopts 12T05 junction box.
Bundesliga’s TSG 1899 Hoffenheim
In July 2014, 3.2MW photovoltaic plant located in Sander shauserBerg industrial park Cassell in northern Germany was put into production.The total capacity of power station is 52MW with 34 arrays using 1000Vdc structure and others using 1500Vdc structure. Part of the power plant adopts 12T05 junction box.
Wuwei in Gansu Province of 300MW photovaltaic plant
On October 13, 2014, German professional football team home stadium parking sets up the output power of 1MW watt class photovoltaic power.Photovoltaic plant is Bundesliga’s TSG 1899 Hoffenheim. Home stadium is in Germany southwestern Baden- Württemberg’s staduim parking lot shed where Hince Haim was there. Part of the power plant adopts 12T05 junction box.
Bundesliga’s TSG 1899 Hoffenheim
February 10, 2015, Ground photovoltaic plant, located in Punjab Province, Pakistan successfully switches on grid connection. It is the first The first megawatt class photovoltaic plant since Pakistan established. 1.25MW photovoltaic plant covers an area of 16000 square meters, located in Punjab Province, Pakistan. Local abundant light makes the photovoltaic power generation capacity of 1745000 kilowatts per year. Part of the power plant adopts 12T05 junction box.
The first megawatt class photovoltaic plant since Pakistan established
Back